Home/Services/Environmental & Municipal/Water tanker supply
EM·01
ENVIRONMENTAL & MUNICIPAL
Water, delivered before you need it.
Water by tanker for sites, camps and facilities across NEOM, Tabuk, Duba and the Red Sea coast. One-off loads when you’re short, or a standing schedule sized so the site tank never runs dry — potable and non-potable supply per order, with source and quality documentation provided per quotation. We size the rhythm from your real consumption, fill your storage directly, and adjust as the site grows.
Tank running low right now? Send the location — we answer against real availability →
SERVICE
EM·01
COVERAGE
04 Nodes
SUPPLY
By Tanker
PATTERN
Per Schedule
FIG.01 DELIVERY VISUALIZER
Watch the tank come back to full.
Pick the use case and run the delivery — the tanker arrives, connects, and the site tank gauge climbs to full. Illustrative; capacities and quantities are confirmed per order.
drag to rotate · scroll to zoom
3D isn't available in this browser. The delivery: the tanker positions at your storage tank, hoses are connected, the tank is filled to the ordered quantity, and the load is noted before departure. Details are in the stages below.
Construction water
Water for concrete, compaction and the works — delivered to your site storage.
FIG.02
WHAT THE SERVICE INCLUDES
From first order to standing rhythm.
Water supply by tanker is a logistics promise: the right water, in the right quantity, before the tank hits empty. Here’s what each stage covers.
STAGE·01
The order
Location, what the water is for, potable or non-potable, and roughly how much you use. That’s enough for a same-conversation answer on price and the first delivery window.
STAGE·02
Sizing the schedule
For recurring supply, we work back from your consumption and storage size to a delivery rhythm with a buffer — so a hot week or a delayed truck never means a dry tank.
STAGE·03
The route
Remote plots, coastal sites and controlled-access project areas are the normal case here, not the exception. Access requirements and timing windows are handled per delivery.
STAGE·04
At the tank
The tanker positions at your storage, hoses are connected cleanly, and the fill runs controlled to the ordered quantity — no overflow, no mess around the tank pad.
STAGE·05
Water & documentation
Potable and non-potable supply are separated per order, with source and quality documentation provided per quotation. Every load is noted, so your records match ours.
STAGE·06
The standing rhythm
Headcount up, works accelerating, summer arriving — the schedule flexes with the site. One message adjusts the frequency; the buffer logic stays.
FIG.03
WHERE THE WATER GOES
Six thirsty kinds of site.
USE·01
Construction works
Concrete, compaction, curing and cleaning — the water the program actually runs on.
USE·02
Worker camps
Daily supply sized to the headcount, delivered before the morning shift notices.
USE·03
Dust suppression
Water for earthworks and haul roads — often the difference between working and being stopped.
USE·04
Landscaping & facilities
Irrigation and facility top-ups on a rhythm that follows the season.
USE·05
Events & temporary sites
Supply that appears for the duration and disappears with the teardown.
USE·06
Remote & coastal plots
Sites beyond the network, where the tanker is the water system.
FIG.04
THE DISCIPLINE
A dry tank is a stopped site.
Nobody praises a water supplier — until the day the tank runs dry and the concrete pour, the kitchen and the wash block all stop at once. The discipline below exists so that day never comes:
EM·01 · SUPPLY CONTROL — WATER TANKER
Order confirmed with use and volume
What the water is for decides how it's carried and documented — potable and non-potable never blur.
Schedule sized with a buffer
Delivery frequency is set against real consumption plus margin, not against the calendar's convenience.
Clean equipment for potable loads
Tanks and hoses for drinking-water supply are managed per order, with documentation per quotation.
Controlled fill, clean pad
The fill runs to the ordered quantity and stops — no overflow around your storage, no water wasted in the sand.
Every load noted
Date, quantity and destination recorded per delivery, so camp managers and QSs reconcile without a phone call.
Schedule reviewed as the site changes
Mobilization, peak works, demobilization — the rhythm follows the site, and the review is our job to raise.
FIG.05
DECISION GUIDE
Which arrangement fits the site?
| Situation | Best Arrangement | Why |
|---|---|---|
| Short one week, need water now | One-off loads (EM·01) | Ordered per load, answered against real availability — no contract needed. |
| Camp or long-running site | Standing schedule | Rhythm sized from consumption with a buffer; the tank stops being anyone's job. |
| Earthworks generating dust | Dust suppression program | Deliveries timed to the working day, scaled to the disturbed area. |
| Camp needs water + sewage + waste | Full site loop with EM·02 / EM·03 | One schedule, one invoice, frequencies sized together. |
Not sure of your consumption? Send the headcount or the works program — sizing it is our job. Describe the site →
POSITION
Water supply isn't sold by the load. It's sold by the mornings nobody had to check the tank.
NEOM · Tabuk · Duba · Red Sea coast — potable and non-potable per order.
FIG.06
HOW TO ORDER
Three steps to a full tank.
STEP 01
Send the basics
Location, what the water is for, potable or non-potable, and roughly how much.
STEP 02
We confirm
Price, quantity and the delivery window — or a proposed schedule for recurring supply.
STEP 03
The tank stays full
Deliveries run on the rhythm, each load noted, the schedule adjusted as the site changes.
FIG.07
VERIFIED REGISTER
The credentials your vendor team checks.
APPROVAL
REGISTRATION
COVERAGE
SUPPLY TYPES
DOCUMENTATION
CAPACITIES
HSE
Certificates and classifications, packaged for tender files, come with each quotation and on the company facts page →
FIG.08
RELATED SERVICES
Close the loop on one contract.
EM·02
Sewage & vacuum tanker
Water in needs sewage out — septic rotations sized to the same headcount.
TBK·DUB·NEM
EM·03
Waste & garbage collection
Bin routes on the same schedule logic — the third leg of the camp loop.
NEM·TBK·DUB
EM·05
Waste skip rental
Skips placed and exchanged for the construction side of the site.
DUB·TBK·NEM
ALL
View all 14 services
The full register across transport, marine, environmental and industrial divisions.
GROUP
FIG.09
SUPPLY REQUEST
Describe the site.
Location, use and rough volume — we confirm price and the first window. About 60 seconds.
Your request goes to the environmental services team. Site information is treated confidentially.
An honest window
First delivery confirmed against real availability, not hope.
A buffer, always
Schedules sized so a hot week never empties the tank.
One operator, whole loop
Add sewage, waste and skips to the same schedule.
PREFER TO TALK?
FIG.10
QUERIES
Water supply, answered.
Send the location, what the water is for, and roughly how much — through the request on this page. Price and the first delivery window come back in the same conversation, and recurring supply gets a proposed schedule.
Yes — both, separated per order and never blurred. Drinking-water loads are handled with the appropriate equipment, and source and quality documentation is provided per quotation for tender and HSE files.
That's the core of the work. Controlled-access project areas, coastal plots and desert sites across the NEOM–Tabuk–Duba corridor are the normal delivery map, with access requirements handled per delivery.
We work back from your consumption and storage size to a delivery rhythm with a deliberate buffer. The goal isn't deliveries on nice round days — it's a tank that never gets near empty, reviewed as the site changes.
Yes — the tanker positions at your storage, connects, and fills controlled to the ordered quantity. Elevated tanks, ground tanks and temporary bladders are all normal, with the fill point agreed on the first visit.
Per order — the tanker size and load count are matched to your quantity and access, confirmed in the quotation, and every load is noted on delivery so your records reconcile with ours.
Yes — deliveries timed to the working day and scaled to the disturbed area, so earthworks and haul roads stay workable and compliant. It runs as its own program or alongside the site's other water.
Send the location and we answer against real availability — often quickly, given the Duba and Tabuk bases, but always confirmed before you plan on it.